Saturday, April 21, 2012

Friday Night Sew In


New York Beauty Block
I got a late start to my Friday night sew in... so only 3 projects finished... but then I started all 3 last night!  

The New York Beauty Block was paper pieced and felt like it was taking forever!  I`m sure it was faster to make the shorts than do this block!  

Shorts were constructed completely on the serger, elastic serged on and coverstitched down.  Pattern from leggings from an older Ottobre pattern.  Just cut with a short inseam.

Shirt was from the latest women`s Ottobre magazine, and I shortened it - because I didn`t have enough fabric, and I was wanting to test out this pattern.  Because of its width, I think it needs the longer length.  I think I`d add a little width to the sleeve... 
Shorts size 128



Shirt size 38, Ottobre 2/2012 


Thursday, April 19, 2012

Catching Up! (Stash Report and WIPs)

Its almost bingo time!  Sign up!









Works in Progress

Below is a table of my current (active) works in progress... Most are either Blocks of the Month, that I got stalled piecing in March, or they are waiting on the longarm machine...  And every garment project I've started this year has been completed....

ProjectNameStall PointStatus
1Stars on the Mountain QuiltPiecingStill need to finish Mountain Blocks
3Animals - UFO #5Longarm
Backing
2 Quilt Tops CompletPed
1 Backing Completed
Need to cut out binding, and 1 Backing
4Sew Happy Geek QALBacking
Longarm
Quilt Top is Completed with Borders ON
Pillow Front is Completed
Binding is Cut Out
Quilt Top ~55"x70"
Need to Make Backing
5Wonky Log Cabin Blocks (Colour Challenge BOM)PiecingJanuary and February Completed
Need to work on March and April
10Just Takes 2PiecingDone some blocks, but not enjoying... might just turn into either a lap quilt, or pillow...  Or let it sit for a while...
13April Mae Designs - Sun BOMEmbroideryJanuary and February Completed
March's has been Started
16Craftsy BOMPiecingJanuary and February Completed
28BMQG - Preemie Donation QuiltBordersBlocks assembled into 9patch for 2 Quilt Tops
Have One Backing Ready to go
31Quilt for my HusbandPiecingMost of the Fabric is Cut Out
32Sewing Machine CoverOn Longarm25% Quilted
33Quilt for my Step-FatherLongarmWhole Cloth Quilt
Ready to go onto longarm


Oh - my last stash report was way too long ago...

Report #11-2012 (11 Mar 2012)
Used this Week:           0  m
          Year to Date:            20.1 m
      Added this Week:          8.8 m
          Year to Date:           39.4 m
      Net Used for 2012:        - 19.3 m

      Projects Completed this week:    0          (Includes UFOs)
          Year to Date:                20
      UFOs Completed this week:        0
          Year to Date:                4
      Mending and Alterations Completed:  0
          Year to Date:                4


Report #12-2012 (18 Mar 2012)
Used this Week:           9.8  m
          Year to Date:            29.9 m
      Added this Week:          0 m
          Year to Date:           39.4 m
      Net Used for 2012:        - 9.5 m

      Projects Completed this week:    5          (Includes UFOs)
          Year to Date:                25
      UFOs Completed this week:        0
          Year to Date:                4
      Mending and Alterations Completed:  1
          Year to Date:                5

Report #13-2012 (25 Mar 2012)
Used this Week:           7.8  m
          Year to Date:            37.7 m
      Added this Week:          0 m
          Year to Date:           39.4 m
      Net Used for 2012:        - 1.7 m

      Projects Completed this week:    3          (Includes UFOs)
          Year to Date:                28
      UFOs Completed this week:        0
          Year to Date:                4
      Mending and Alterations Completed:  0
          Year to Date:                5



Report #14-2012 (1 Apr 2012)
Used this Week:           0  m
          Year to Date:            37.7 m
      Added this Week:          2.1 m
          Year to Date:           41.5 m
      Net Used for 2012:        - 3.8 m

      Projects Completed this week:    0          (Includes UFOs)
          Year to Date:                28
      UFOs Completed this week:        0
          Year to Date:                4
      Mending and Alterations Completed:  0
          Year to Date:                5


Report #15-2012 (8 Apr 2012) - No CHANGE (NET USED -3.8m)
Report #16-2012 (15 Apr 2012) - No CHANGE (NET USED -3.8m)



















Sunday, April 15, 2012

My Bingo Card



BINGO
BusSnowmanPot of GoldButterflySun
FlowerReindeerWhalePumpkinRhino
HatsPaintsFREEButtonsSpider Web
StarsGingerbread ManGiraffeCandyBear
BatFishCatepillarHeartsPlanets






Saturday, April 14, 2012

Kaitlyn's BINGO Card



BINGO
BearSpider WebCandySunHippo
ClockHatsButterflyPot of GoldHeart
ShowmanCatepillarFREEWhaleBunny
Gingerbread ManFishGhostPlanetFlowers
LettersCirclesThreadGiraffeStars






Alexandra`s Bingo Card


BINGO
Lady BugReindeerBatSunButtons
Pot of GoldSnowmanStarsFishLeaf
LionsBearFREELettersButterfly
HippoGingerbread ManHeartsPlanetFlowers
CatepillarStockingPlaidBackpackThread






Wednesday, April 11, 2012

2nd Quarter Finish-A-Long


Projects I hope to complete this Quarter
  • Air plane Donation Quilts (x2)
    needs borders, backing, quilting  & binding
  • New York Beauty Top
    finish blocks, set blocks, back, quilt   & binding
  • Sew Happy Geek QAL Quilt
    prep backing, quilt  & binding
  • UFO #5 Quilts (x2)
    backing ready for one top, quilt  & binding
  • My step-fathers Birthday Quilt
    need to make black bias tape, apply, quilt  & binding
  • My Stars on the Mountain Quilt
    finish top, backing, quilting  & binding
  • Sewing machine Cover
    finish quilting, bind, add ties
  • Garment Sewing UFOs - Top for me, top for my youngest, tunic for my youngest, skirt for my oldest daughter
    Various stages
  • Dresden Quilt
    Finish quilting 2 of 4 blocks, sew together & bind
  • Dresden Table Topper
    add borders, backing, quilting & binding

Some BOM that I will continue on
  • Hello Sun Quilt A Long by April Mae Designs
  • Craftsy BOM 
  • Just Takes 2 QAL
  • Wonky Logcabins BOM








Thursday, April 5, 2012

UFOs and WIPs Update

This may be a little scattered...sorry my Gram passed away last week at nearly 96 years.  My brain isn't thinking sewing right now...

I never completed March's UFO... But I did complete two tops from the UFO #5 that was earlier in the year.

April's UFO probably won't be completed... I'd like to complete my UFO #5, and my Dresden Quilts, as well as a few new completed tops.

In March, I made swim bottoms, a dress and top for my youngest....

Projects:
  • Air plane Donation Quilt(s) - two tops needing borders
  • New York Beauty Blocks 1 & 2 Completed
  • Sew Happy Geek QAL - top completed Borders added
  • UFO #5 - Two tops waiting to be quilted 
  • Hello Sun Quilt A Long by April Mae Designs - stitching nearly done
  • Sewing machine Cover - some feathers tried
No progress:
  • Craftsy BOM 
  • Just Takes 2 QAL
  • My step-fathers Birthday Quilt
  • My Stars on the Mountain Quilt
As for my stash report.... I'm behind!  Maybe next week....

I've updated my first quarter posts with my completions for the first quarter....