Quilt #3 (February's UFO) Update:
This is my daughters birthday gift... its not finished. BUT my February UFO goal is met - to assemble the top and bottom layers of this quilt. This week I will layer it with the batting and then start quilting it.
I am thinking of straight line quilting on both the diagonals and vertical/horizontal. This will be similar to the other quilt I did with wavy quilting lines in the 4 directions. I think I want to stick to straight lines because of all the straight lines in this quilt.
I think the quilting of this fabric will go quickly as it is straight lines!
 |
First attempt at the backing...
Notice the little bit of pink showing at the top and bottom |
Yesterday I finished the top, and thought I finished the backing, but when I got home and laid them together, I realized that I'd forgotten to compare my final measurements of the two... the top was about ~6" longer than the backing! So I added another layer today.
So how did it end up too short? I knew I needed it approximately 100" long... I used the width of the fabric (which I
approximated to be 45") and then I added a strip of 12" baskets. So is 45"*2+12-Seam Allowances long enough? NO! Because the fabric wasn't quite 45" and my quilt is slightly longer than 100"!
 |
Revised Backing
See added strip near the top!
Using up some strips and "extra" triangles |
And I didn't compare the two numbers, nor measure the final backing until I laid it on top of the quilt top to show my husband. Oops!
Today I shared this with my daughter (and the rest of the family) - giving it to her at her birthday party. After being so sad since her brother got his 2 weeks ago, she was very happy today. Sorry no pictures, I was holding the quilt and no one grabbed my camera. I NEED to check with my mom or husband... hopefully someone got a photo of her with her quilt...
And on that note, I wish I was 8! She got the following
Fashion Studio for her birthday! I wish I'd had one when I was 8...
BTW, the next projects I'm making are SMALL. And sure hope
March's UFO challenge, has a quick and easy project (I have one that only requires binding... hopefully that one gets chosen!)
Quilt #2 (January's UFO) Update:
I started quilting this! YEAH! But only did some stitch in the ditch to anchor it all together. Need to do some detail quilting... Lots of details to quilt on this one!
Now back to the sewing room, to finish these two quilts! Actually I need to set up in the family room to quilt these, there isn't enough space to quilt these (both approx 80"x100").
STASH UPDATE:
Stash Report week 6 / 2011 (Jan 31-Feb6)
Used this Week: 15.8
Used year to Date: 26.1m
Added this Week:0
Added Year to Date:4.5 meters
Net Used for 2011: 21.6
Note: I don't count batting as "Stash" so I haven't counted the batting I just purchased to finish Quilt #3....
Note 2: Of the 4.5m of fabric I purchased this year, I have used nearly all of the 3m of pink fabrics purchased - one fabric I have less than a FQ, the other I might have a FE in about 5 or more pieces... So I'm going to say its all gone - extras are in the scrap bin! I did use a little white (1m), and haven't used any black yet (0.5m) - those were both bought to keep on hand, as I'd run out of them.
2011 UFO Challenge Update
My list for the UFO Challenge is posted
here
January's UFO Progress
-- January Goal: to finish the Quilt top and backing
GOAL MET (Jan 31,2011)!
-- February Goal: to finish the quilting and label
- Quilt topDONE!
- BackingDONE!
- Cut and Piece Binding DONE!
- Layer and Baste - DONE!
- Label - to do
- Quilting - started
- Trimming - to do
- Binding - cut out, and ironed ready to apply
February's UFO Progress
-- February Goal: to finish the Quilt top and backing
GOAL MET (Feb 6,2011)!
-- Dream Goal: to finish the quilting and label
- Quilt top -DONE!
- Backing -DONE!
- Cut and Piece Binding - to do
- Layer and Baste - to do
- Label - to do
- Quilting - to do
- Trimming - to do
- Binding - to do