Progress is slow, but I haven't made it often to my sewing room.
Project D: I found another UFO, another Christa Quilts QAL top. The top is finished, I'm working on assembling a backing out of scraps.
![]() |
| Peace Love Quilts Mystery |
![]() |
| Project H: Peace Love Quilts QAL Step 1 - 5 Complete. Step 6 started Step 7 has been released. |
![]() |
| Project I-1: Top for this quilt assembled. Might add a black border to this. |
![]() |
| Project G: Bonnie Hunter 3.5" Squares Trimmed. |
![]() |
Project I-3: 8 blocks ready to add sashing to.
Another 4 to add the borders on the blocks.
The 4 that aren't finished yet needed 2 rows as they were slightly smaller....
|
Project K: Fabric for binding located & cut
Project L: I have assembled the hearts top into strips. BUT need some more fabric! I ran out of pink sashing fabric.... to make my 9 patches.











